ENVIRONMENTAL AND SAMPLING SERVICES

  • Environmental Borings
  • Well Installations (1" to 8")
  • Well Development
  • Well Abandonment
  • Interval Soil Sampling
  • Continuous Soil Sampling
  • Mud Rotary 4" - 6"
  • CME Continuous Core Sampling
  • Hollow Stem Augers
  • Angle Drilling
  • Single and Double Monitoring Well Installations
  • Recovery Well and Extraction Well Installations
  • 5-foot Continuous Core Soil Sample Collection - 4"
  • Wireline Split-Spoon Soil Sample Collection - 4" & 6"
  • Direct Push Soil Sampling

 

 

LANDFILL SERVICES

  • Landfill environmental impact monitoring;
  • Landfill characterization, includes both recovery of underground structure and estimation of reserves of different waste;
  • Determination of landfill gas productivity;
 

WELL DECOMMISSIONING

  • Required by Ministry of Environment if the well is no longer in use or in poor condition;
  • Completion of well record (required by the MOE);
  • A copy of the well record goes to the owner and a copy is sent to the ministry.
 

GEOTECHNICAL

  • Geotechnical Borings
  • Automatic Hammer Sampling
  • Wireline Sampling
  • Oriented Continuous Core
  • Shelby Tube Sampling
  • Observation Well Installation
  • Well Abandonment
  • Slope Indicator Installation
  • Hollow Stem Auger
  • Solid Stem Auger
  • Angle Drilling
  • CME Automatic SPT Hammer

 

 

DIAMOND DRILLING / CORING

  • NQ, HQ, PQ Wireline Coring
  • With air, water or mud
  • Nitrogen mechanical packer tests

 

 

OFFSHORE DRILLING (DEEP & SHALLOW WATER)

  • 16 x 16 barge
  • Sediment/soil sampling & continuous
  • Mud Rotary & Air Rotary
  • Cone Penetration Testing (CPT)
   
18 Gormley Industrial Ave., P.O. Box 279, Gormley, Ontario L0H 1G0   |   (T) 905 888-9999